TIMELINEPhases in Project
Development

28 condominium floorplans of varying sizes, with landscaped gardens, rooftop leisure spaces, and secure garage parking and much more available for move-in December 2026

YOUR HOME AWAITS IN…Anticipated completion — December 2026

Track each phase as Liberty Condos advances toward completion.

2020

MARCH 2020

Phase 1 — Breaking Ground

The vision for Liberty Condos began to take shape as work started on-site. Excavation and site preparation marked the official breaking ground — a milestone that signaled the start of construction and the transformation of plans into reality.

AUGUST 2020

Phase 2 — Foundation Completed

With the foundation poured and structural footings in place, Liberty Condos stood on solid ground. This stage secured the strength and stability of the development, ensuring a lasting base for the residences that will rise above it.

JUNE 2021

Phase 3: Rising Floors → Mid-Level Structure

By reaching the middle floors, the building’s form began to take shape. Each level was poured and reinforced, giving a clear sense of the residences and communal areas that will soon welcome residents.

OCTOBER 2022

Phase 4: Elevation → Rooftop & Amenities Framework

The top floor and rooftop deck were completed, opening the way for Liberty’s signature amenities — including the pool, sky lounge, and rooftop bar — to take form. This phase elevated the project’s identity as more than a residence: a lifestyle.

AUGUST 2023

Phase 5: Exterior Shaping → Plastering & Façade Works

Exterior plastering smoothed the structure and prepared the building for its finishing layers. This stage brought definition to the façade, turning raw concrete into the first impression of Liberty Condos’ design.

March 2026

Phase 6: Interiors Scheduled

Work on flooring, cabinetry, lighting, and fixtures begins. With interiors coming to life, March 2026 marks the start of Liberty’s residences transforming from structure to stylish, functional homes.

[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

2026

DECEMBER 2026

Move-In Ready – First Tenants Moving In

The first residents are expected to receive keys by December 2026. With all construction complete, amenities operational, and residences delivered, Liberty Condos will officially open as one of Accra’s newest and most distinctive addresses.

[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]
LibertyCondos1
interior_Yaa_Asantewaa_livingroom
amenities_shower
amenities_pool
LC_Rec1
LibertyCondos7
LC_Kids_Gh2
LibertyCondos6
https://libertycondosgh.com/wp-content/uploads/2025/08/LC_Logo_Gold-1-1.png
GE 357-5079 Parakuo Boundary Road, Parakuo Estates Junction
info@libertycondosgh.com

Follow us:

CALL US

Your home, your investment, your legacy. Liberty Condos brings modern living to Accra today. With refined finishes and an affordable price point, this is an opportunity you cannot miss.

© Liberty Condos 2025. All rights reserved  Designed by NCENTIPAQ